We.ProtectAcademy

Learn to protect what matters

23

Guided lesson

How Approval-Gated Containment Works

Explore a containment model that respects maintenance windows and production safety.

Not Started 9 min Advanced
Step 1 of 617% contentKnowledge check pending

Objectives

By the end of this lesson, you will understand:

  • Describe an approval gate in plain words.
  • Explain what a rollback plan does.
  • Follow containment from detection to verification.
  • See how monitoring protects production during a change.

Concept flow

Detection

Stage 1 of 6

We.Protect identifies a production-critical risk.

Possible defensive checkpoints

Approval gateRollback planVerification

Detection

We.Protect spots a production-critical risk.

What you are seeing
  1. A finding appears in a queue
  2. The asset name is attached
  3. A production badge lights up

Simple explanation

The platform gathers a finding from an existing tool and attaches the asset name.

Business context shows that the asset supports a live process.

Example

At Trident Assembly, the finding points to an engineering workstation.

Why this matters

It turns a technical observation into a case people can understand.

Key term

Knowledge check

Show what you learned

Answer every question. You do not need a perfect score to complete the lesson.

3 questions
  1. 01What is an approval gate?
  2. 02A rollback plan is only needed after something has already gone wrong.
  3. 03During a controlled action, a process measure moves outside its normal range. What should happen?

SIMULATION

The Approval Gate

Northern Precision Manufacturing plans containment for a production-critical risk.

Follow an approval-gated containment workflow without risking the production process.

SIMULATION · weprotect-demo-tenant · FIXTURES · Demo tenant · isolated fixtures · no customer data

Score: 0% · Best: 0%

Stage 1 of 3
OperatorPlant teamScannerFinding sourceRisk engineBusiness contextChange boardProduction approvalOT gatewaySegmentationHMIOperator viewPLCControl systemMFG-SQL-01Production data
REQUESTA risk is detected on a production system. What is attached before a decision?

Live metrics

USERS1240
AUTHENTICATIONS / MIN86
FAILED LOGINS4
ALERTS2
CRITICAL FINDINGS0
RISK SCORE24 / 100
OPEN INCIDENTS0
SLA TIME45 min
ENDPOINT HEALTH98%
ASSETS AT RISK0
verificationStatusPending
productionImpactNone

Scenario parameters

Asset
MFG-SQL-01
Exposure
internal
Production criticality
critical
EDR health
96
Approval required
Yes
Maintenance window
02:00–03:00 UTC (planned)

Simulation paused at a decision point

A risk is detected on a production system. What is attached before a decision?

Ready to read
SIMULATION

Using a system fallback voice; quality may vary.

Read instead

Captions: Welcome to this simulation: The Approval Gate. This is an isolated training environment with demo fixtures.

Assessment

Formal lesson assessment

5 questions. A score of 70% or higher demonstrates mastery. Answers stay hidden until you submit.

0/5 answered
  1. 01In approval-gated containment, a named owner authorises the action before it runs, and the result is verified afterwards.

    Difficulty 2 · true false

  2. 02A rollback plan is only needed after something has already gone wrong.

    Difficulty 2 · true false

  3. 03During a controlled action, a process measure moves outside its normal range. What should happen?

    Difficulty 4 · scenario

  4. 04Tailspin Toys detects a production-critical risk. The proposed containment is ready, but the process is mid-batch and the named owner is unavailable. What is the correct move?

    Difficulty 4 · scenario

  5. 05What is an approval gate?

    Difficulty 2 · multiple choice

Answer every question before submitting.

AI tutor

Help only. The tutor never changes scores, progress records, or certificates.

What makes this lesson complete

  • Lesson content: pending
  • Simulation: pending
  • Assessment: pending