22Guided lesson
Why You Should Not Automatically Shut Down OT
Why a high risk score must never trigger an automatic shutdown of production equipment.
Step 1 of 617% contentKnowledge check pending
Objectives
By the end of this lesson, you will understand:
- Explain why a high score must not automatically stop production.
- Name the six stages of a careful response.
- Describe the roles of safety and availability in that decision.
- Explain why a named person approves production changes.
A risk is noticed and recorded.
Possible defensive checkpoints
Human approvalAvailabilitySafetyMaintenance window
01
Detection
A tool notices a finding and records it.
- A risk score appears on a dashboard
- The asset name is attached
- No machine action is taken
Simple explanation
A scanner or endpoint tool reports a weakness on an Operational Technology (OT) asset.
The report is a signal, not an instruction to stop anything.
Why this matters
It keeps the first reaction informational instead of physical.
Key term We.Protect adds context before anyone acts. Knowledge check
Show what you learned
Answer every question. You do not need a perfect score to complete the lesson.
3 questions
SIMULATION
Pause Before You Stop the Line
A high-risk finding appears on a production controller at Northern Precision Manufacturing.
Choose an approval-gated response that respects safety and availability.
SIMULATION · weprotect-demo-tenant · FIXTURES · Demo tenant · isolated fixtures · no customer data
Score: 0% · Best: 0%
Stage 1 of 4
REQUESTA tool suggests stopping the line at once. What is the first action?
Live metrics
USERS1240
AUTHENTICATIONS / MIN86
FAILED LOGINS4
ALERTS2
CRITICAL FINDINGS0
RISK SCORE24 / 100
OPEN INCIDENTS0
SLA TIME45 min
ENDPOINT HEALTH98%
ASSETS AT RISK0
verificationStatusPending
productionImpactNone
Scenario parameters
- Asset
- MFG-SQL-01
- Exposure
- internal
- Production criticality
- critical
- EDR health
- 96
- Approval required
- Yes
- Maintenance window
- 02:00–03:00 UTC (planned)
Ready to readSIMULATION
Using a system fallback voice; quality may vary.
Read instead
Captions: Welcome to this simulation: Pause Before You Stop the Line. This is an isolated training environment with demo fixtures.
Assessment
Formal lesson assessment
5 questions. A score of 70% or higher demonstrates mastery. Answers stay hidden until you submit.
0/5 answered
Answer every question before submitting.
AI tutor
Help only. The tutor never changes scores, progress records, or certificates.
What makes this lesson complete
- Lesson content: pending
- Simulation: pending
- Assessment: pending